Mat foundations. Design a mat foundation independently (without the upper part of the structure)

Follow the following steps:

1. Define a new job

2. Within the Column Definition tab, place the column starts using the option Introduction > Columns, shear walls and starts > New start.

3. To introduce the loads of the columns click on Columns > Head loads, and introduce the axial forces, moments and shear forces.

4. Within the Beam Definition tab, introduce the mat foundation and Analyse.

Top Top

©CYPE Ingenieros - Av. de Loring, 4 - 03003 ALICANTE. Spain
Tel. USA (+1) 202 569 8902 // UK (+44) 20 3608 1448 // Spain (+34) 965 922 550 - Fax (+34) 965 124 950
Home | CYPE | Legal Aspects | Products | Versions | Downloads | Contact us
Bulgarian | French | Italian | Portuguese | Spanish | Spanish (Mexico) | Other dealerships