Mat foundations. Design a mat foundation independently (without the upper part of the structure)

Follow the following steps:

1. Define a new job

2. Within the Column Definition tab, place the column starts using the option Introduction > Columns, shear walls and starts > New start.

3. To introduce the loads of the columns click on Columns > Head loads, and introduce the axial forces, moments and shear forces.

4. Within the Beam Definition tab, introduce the mat foundation and Analyse.

Top Top Top Section Go back go back

Top Top

©CYPE Ingenieros, S.A. - Avda. Eusebio Sempere, 5 - 03003 ALICANTE. Spain
Tel. USA (+1) 202 569 8902 // UK (+44) 20 3608 1448 // Spain (+34) 965 922 550 - Fax (+34) 965 124 950
Home | CYPE | Legal Aspects | Products | Versions | Downloads | Contact us
Bulgarian | French | Italian | Portuguese | Spanish | Spanish (Mexico) | Other dealerships